Church of the Valley

Shenendoah Valley, Virginia

Completed: September, 2007

Visible From: I-81

Cross Arms: 40', 50', and 40' respectively

Construction Material: 18 Sided Steel Tube

Surface Finish: White Acrylic

Safe Wind Load Rating: 90 MPH

Foundation Method: Drilled Footing

Foundation Size: 6' x 14' -6", 8' x 17' -6", and 6' x 14' -6" respectively

Concrete: 66 yards for all 3 crosses

Lighting: 18,000 Watts

Time To Build: 15 Weeks

Send Us A Message

CAPTCHA
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.
One Freedom Square
Laurel, Mississippi 39440-3367
(601) 649.1977
   Back To Top