Shenendoah Valley, Virginia
Completed: September, 2007
Visible From: I-81
Cross Arms: 40', 50', and 40' respectively
Construction Material: 18 Sided Steel Tube
Surface Finish: White Acrylic
Safe Wind Load Rating: 90 MPH
Foundation Method: Drilled Footing
Foundation Size: 6' x 14' -6", 8' x 17' -6", and 6' x 14' -6" respectively
Concrete: 66 yards for all 3 crosses
Lighting: 18,000 Watts
Time To Build: 15 Weeks