Go to...
Graniteville, South Carolina
Completed: March 2015
Note: Located on the side of a mountain and visible at night up to 20 miles away.
Construction Material: Plate Steel
Surface Finish: White Urethane Paint
Foundation Method: Embedded steel support pole with reinforced concrete
Lighting: LED flood lights
Time To Build: 20 Weeks